Ghana BUIPE River Water Treatment Plant
Consult Now
Need help? We’re here to help!
Phone
+86-158 6303 7696
+86-139 6390 1909
cnrunyuan@gmail.com
Ghana BUIPE River Water Treatment Plant
Project Overview
(1) The Buipe Water Supply Project proposes the design, construction and commissioning of a water treatment system to supply potable water to Buipe Township and its surroundings in the Central Gonja District of the Savannah Region, Ghana.
(2) The project will utilize raw water from the Black Volta River, treat it through a compact gravity-assisted water purifier to get WHO-standard drinking water.
(3) The drinking water will be distribute it to the community for domestic and light industrial use through a pressurized and gravity-fed network. Estimated total pipeline length over 11Km.
Treatment Process

Treatment Capacity
(1) Design Capacity 3,000M³/day (expandable to 4,100 M³/day) with flow rate 150 M³/H.
(2) Reliable access to safe water for 30,000+ people.
(3) Assuring drinking water supply for industrial operations and schools.
+86-158 6303 7696
cnrunyuan@gmail.com
Phone
+86-158 6303 7696
+86-139 6390 1909
Address
Room 810, Building 1, Hisense Caizhi Valley, No. 88, Zhuzhou Road, Qingdao, Shandong, China
Rely Environmental Technology
WhatsApp:
E-mail:
Telephone:
导航下拉添加类名.active
在线客服添加返回顶部
页面顺滑的滚动
右侧在线客服样式 1,2,3 3
图片alt标题设置: Qingdao Rely Environmental Technology Co., Ltd
表单验证提示文本: Content cannot be empty!
循环体没有内容时: Sorry, no matching items were found.
CSS / JS 文件放置地