Fresh Dry Straw Treatment Biogas Plant
Consult Now
Need help? We’re here to help!
Phone
+86-158 6303 7696
+86-139 6390 1909
cnrunyuan@gmail.com
Fresh Dry Straw Treatment Biogas Plant
Biogas Plant Treatment Process
(1) All kinds of fresh and dry straw is transported to the biogas plant site. Then all dtsraw will be cruhsed into 10-20mm particles.
(2) All straw will be delivered into the sewage collection and allocation tank, equipped with the rotor lift pump and the submersible mixer. After mixing with water and homogenizing, all raw materials are pumped into the CSTR independent tank for fermentation.
(3) CSTR anaerobic fermentation involves crushing various types of straw and other organic matter, adjusting the feed TS concentration betwen 8-12%.
(4) After entering the CSTR reactor, the CSTR reactor adopts lower feed stock and upper discharge with mechanical stirring, the gas production rate between 1.0 and 1.2 depending on the raw material and temperature.
(5) It adopts the medium temperature fermentation process with "pretreatment + CSTR + secondary fermentation" as the main part, with the fermentation temperature of 35-37ºC.
(6) The fermented biogas slurry enters the secondary fermentation tank for secondary fermentation. The biogas produced by the two tanks enters the independent biogas storage tank.
(7) After solid-liquid separation, biogas residue and biogas slurry are used to produce organic fertilizer and liquid organic fertilizer.
(8) After desulfurization, decarbonization and purification treatment, biogas is compressed and used for vehicle gas or enters urban gas pipelines.
2 Biogas Plant Treatment Process Diagram

3 Biogas Plant Treatment Capapcity
(1) The exactly biogas plant scale will be designed based on your buyer deamnds.
(2) As normal,the biogas plant can treat fresh and dry straw 1 Tons to 250 Tons per day.
(3) The biogas production can reach 120-30000NM³ per day.
4 EPC Service offered
(1) Freely Preliminary Technical Consultation
(2) Treatment Process design
(3) Comprehensive Project Equipment Supply
(4) Installation Technical Support
(5) Debugging Technical Support
+86-158 6303 7696
cnrunyuan@gmail.com
Phone
+86-158 6303 7696
+86-139 6390 1909
Address
Room 810, Building 1, Hisense Caizhi Valley, No. 88, Zhuzhou Road, Qingdao, Shandong, China
Rely Environmental Technology
WhatsApp:
E-mail:
Telephone:
导航下拉添加类名.active
在线客服添加返回顶部
页面顺滑的滚动
右侧在线客服样式 1,2,3 3
图片alt标题设置: Qingdao Rely Environmental Technology Co., Ltd
表单验证提示文本: Content cannot be empty!
循环体没有内容时: Sorry, no matching items were found.
CSS / JS 文件放置地